How to renovate in Luxembourg: the key steps
Renovating a home in Luxembourg means preparing each step carefully: understanding the existing building, checking the municipality’s rules, setting a realistic budget and organising the works. Here is the method we apply on our projects.
- Author
- Olivier Morvan, architect
- Reading time
- 2 min

1. Start with a survey of the existing building
Before drawing anything, you need to know what you are building on. A measured survey and a technical inspection assess the structure (load-bearing walls, floors), the services (electrics, plumbing, heating), the envelope (roof, insulation, windows) and any materials that need treatment. This survey is what prevents surprises once the site is open.
2. Check what the rules allow
Every Luxembourg municipality has a general development plan (PAG) and, depending on the area, special development plans (PAP). They govern façades, volumes, extensions and the number of homes allowed. In an apartment, the co-ownership rules and the approval of the general meeting may also be required, especially for work on common parts or the structure.
3. Find out whether a building permit is needed
Simple interior works that do not alter the structure or the exterior can sometimes be carried out without a permit. However, changes to the façade, extensions, adding a storey, a change of use or structural works generally require a building permit issued by the mayor. Rules vary from one municipality to another: check with your municipality’s technical department or your architect. Our guide How to obtain a building permit in Luxembourg explains the process.
4. Set a realistic budget
A renovation budget covers the works, fees, any technical studies (structural engineer, building services), taxes and a contingency reserve. An estimate drawn up at the feasibility stage, then refined at each phase, lets you make the right trade-offs at the right time.
5. Look into grants
The Luxembourg State supports the energy renovation of homes, notably through the Klimabonus programme, and a reduced VAT rate may apply, under conditions, to works on a main residence. Conditions change regularly: check them on guichet.lu and with Klima-Agence before starting, as some grants must be applied for in advance.
6. Tender the works
A clear tender package (drawings, specification) lets you receive comparable bids. The analysis is not only about price: timescales, references, insurance and understanding of the project matter just as much.
7. Supervise the works
Regular on-site supervision coordinates the trades, settles details as they arise and keeps costs and schedule under control. Final acceptance of the works, with any snagging items cleared, closes the project.
In short
- Have the building surveyed before committing, ideally before buying.
- Check the PAG, PAP and co-ownership rules.
- Plan ahead for the building permit and grant applications.
- Set a budget with a contingency reserve.
- Have the works supervised by a professional.
Discover our renovation services and our projects Gardin and Irmine.
This article gives general guidance. Rules and grants change and vary between municipalities: check them for your project, or get in touch.